Ambarli HP EVAP Project,Turkey

On September 30th,2009, Metals International Limited was awarded a contract for the supply of ASME SA 213 T11/T22 Tubes for Boiler of Ambarli Project, with total quantity of 1200 metric tons at 19.650mm longest tube ex-China, and to be shipped to Antwerp,Hamburg,Ukrane, Nanjing,Shanghai.

The tubes was inspected by Moody International as Third Party Inspection Agency. The client was very satifactory with oiur products quality and delivery schedule.